Category List
Contact Us
Mob/Wechat/WhatsApp:
E-mail:
Address:
513 Guangzhou North Road, Jiaozhou City, Qingdao, Shandong, China
10T batch pyrolysis plant
Category:
Batch Type Pyrolysis Plant
2. Pyrolysis process:After the feeding is completed, the feeding port of the pyrolysis furnace is closed, and diesel is used as fuel to spray into the combustion chamber at the bottom of the pyrolysis furnace.
3.The pyrolysis of waste tires can be divided into the following stages:The pyrolysis temperature range is from 0 ∽120 ℃ stage,
The pyrolysis temperature range is between 120~380 ℃ and the insulation stage,Cooling stage,Discharge stage of pyrolysis furnace
Process flow of pyrolysis machine:
1. Feeding process:The feeding time for a single pyrolysis furnace is 1 hour (00:00-01:00).
2. Pyrolysis process:After the feeding is completed, the feeding port of the pyrolysis furnace is closed, and diesel is used as fuel to spray into the combustion chamber at the bottom of the pyrolysis furnace.
3.The pyrolysis of waste tires can be divided into the following stages:The pyrolysis temperature range is from 0 ∽120 ℃ stage,The pyrolysis temperature range is between 120~380 ℃ and the insulation stage,Cooling stage,Discharge stage of pyrolysis furnace
10T batch pyrolysis machine parameter:
Item |
Name |
Remark |
Quantity |
||
Feeding system(transport tire block to the pyrolysis reactor) |
|||||
1 |
TP30JX JL.1 Feeder |
Assembly components |
1set |
||
2 |
TP30JX JL.2 Feed Bin Assembly |
Assembly components |
1set |
||
3 |
TP30JX.LJ Meter regulator |
National standard |
/ |
||
Pyrolysis module(Reaction device for tire block) |
|||||
1 |
TP30JX LJ.1 Reactor roller |
316L |
1set |
||
2 |
TP30JX LJ.2 Slag discharge box |
Assembly components |
1set |
||
3 |
TP30JX.LJ.3 Reactor lower shell |
Ceramic fiber insulation m |
1set |
||
4 |
TP30JX.LJ.4 Reactor upper shell |
Ceramic fiber insulation m |
1set |
||
5 |
TP30JX LJ.5 Feeding cover |
Q345R |
1set |
||
6 |
TP30JX LJ.6 Discharge cover |
Q345R |
1set |
||
7 |
TP30JX LJ.7 Front End Roller Assembly |
45 # steel quenching and tempering |
1set |
||
8 |
TP30JX LJ.8 Rear Roller Assembly |
45 # steel quenching and tempering |
1set |
||
9 |
TP30JX LJ.9 Compression Sealing |
/ |
1set |
||
10 |
TP30JX LJ.10 insulation box packing pressure plate |
/ |
2sets |
||
11 |
TP30JX LJ.11 driven gear |
/ |
1set |
||
12 |
Helical gear reducer motor |
/ |
1set |
||
Condensing system(Separate, cool, and collect the pyrolysis oil and gas) |
|||||
1 |
TP30JX LN.1 Heavy Oil Tank |
Q345R |
1set |
||
2 |
TP30JX LN.2 Spray Tower |
Q345R |
1set |
||
3 |
TP30JX LN.3 air-cooled cooling tower components |
Q345R |
1set |
||
4 |
TP30JX LN.4 condenser |
Q345R |
2sets |
||
5 |
TP30JX LN.5 light oil tank |
Q345R |
1set |
||
6 |
TP30JX LN.6 air distribution box |
Q345R |
1set |
||
7 |
TP30JX LN.7 Pipeline |
/ |
1set |
||
8 |
TP30JX LN.8 Pipeline |
/ |
1set |
||
9 |
TP30JX LN.9 Pipeline |
/ |
1set |
||
10 |
TP30JX LN.10 Pipeline |
/ |
1set |
||
11 |
DN250 manual knife gate valve |
/ |
1set |
||
Slag discharge module(Cool and collect the carbon black) |
|||||
1 |
TP30JX CZ.1 slag conveying spiral |
/ |
1set |
||
2 |
TP30JX CZ.2 First stage slag discharge spiral |
/ |
1set |
||
3 |
TP30JX CZ.3 Secondary slag discharge spiral |
/ |
1set |
||
4 |
TP30JX CZ.4 Knife Seal Gate Valve |
/ |
2sets |
||
5 |
DN300 PN1.0 knife gate valve |
/ |
2sets |
||
6 |
Helical gear reduction motor |
/ |
3sets |
||
Platformsystem(Equipment steel structure support frame) |
|||||
1 |
Platform |
Q345 |
1set |
||
2 |
Support legs、cross braces |
Q345 |
1set |
||
3 |
Diagonal ladder 、guardrail |
Q345 |
1set |
||
Heating system(Provide pyrolysis temperature for tire) |
|||||
1 |
Air preheater section |
|
2sets |
||
2 |
Hot air stove section |
|
2sets |
||
3 |
Circulating fan section |
|
2sets |
||
4 |
Smoke exhaust and induced draft fan section |
|
2sets |
||
5 |
Pipelines, valves, and instruments |
|
2sets |
||
6 |
Control system |
|
3sets |
||
Electrical module(Intelligent processing, ensuring stable operation through PLC electrical control) |
|||||
1 |
Electric control cabinet |
1set |
Our professional after-sales service
1. Equipment quality warranty period: 12 months. During the warranty period, we are responsible for replacing all non-standard and national standard accessories free of charge, and providing lifelong maintenance
2. Installation and debugging: We send engineers to install and debug, and train staff to master equipment operation and production skills,Customer is responsible for round-trip airfare for our personnel, responsible for their food, accommodation, and transportation, aslo responsible for their safety.
Our certification:
Our customer
Our shipment
Keywords: Waste Tire Pyrolysis Plant | Recycling machine | Carbon Black Processing Machine
Related Products
Related Messages
Qingdao Longyuan Baihong Machinery Equipment Co., Ltd.
Mob: +86 15854201728(Helen)
E-mail: info@qdlybh.com
Add: 513 Guangzhou North Road, Jiaozhou City, Qingdao,Shandong Province,China
Customer Message
Copyright © 2023 Longyuan Baihong SEO Business license